HOME  »  Andre's 1968 Triumph GT6 MK1 - 2006 Photo Gallery » 24 June 2006 Headliner & Carbs »  Viewing DSCN0927     [Image 2 of 11]  :: Jump To  
  First slide Previous slide      Show/Hide EXIF Info Index Page Start/Stop the slide show      Next slide Last slide  
Comment: Headliner install continues.
DSCN0926 * Dash was installed the other day, well laid into place. * Dash was installed the other day, well laid into place. * 2288 x 1712 * (1.37MB)

Click for the original image
 
DSCN0927.JPG - 2288 x 1712 - (1.46MB)
Download file (1.46MB)
Jun 24, 2006 - 03:57 PM
DSCN0928 * We'll finish it off on Monday. * We'll finish it off on Monday. * 2288 x 1712 * (1.41MB)

DSCN0929b * I can't wait to have all the glass installed so I can bath Smurf. * I can't wait to have all the glass installed so I can bath Smurf. * 2288 x 1712 * (975KB)

DSCN0930 * Another nice int shot. I need to make some glove boxes. * Another nice int shot. I need to make some glove boxes. * 2288 x 1712 * (1.46MB)

DSCN0935 * Another headliner shot. * Another headliner shot. * 2288 x 1712 * (1.35MB)

DSCN0936 * And the mirror. I need to glue that trim piece. * And the mirror. I need to glue that trim piece. * 2288 x 1712 * (1.27MB)

Album last updated on May 05, 2009 - 09:50 PM
Powered by Jalbum 8.2 and BluPlusPlus skin
GT6.ca